GRE Solutions Manual, Problem 6.10

This page is part of my unofficial solutions manual to the GRE Paper Practice Book (2e), a free resource available on the ETS website. They publish the questions; I explain the answers. If you haven’t worked through the Practice Book, give Section 6 a shot before reading this!

6.10: Dueling Copiers

This is a special kind of algebra problem called a work-rate problem. There is a basic procedure for these that we can follow every time. It boils down to two steps:

  • Figure out the work rate of each machine (worker, factory, etc.).
  • Apply those rates to solve for the target quantity.

In this problem, we have enough information to calculate each machine’s work rate directly:

GRE 6.10, Eqn. 1

What we really want to know, however, is the difference in the output of the two machines if each one runs for a specified amount of time:

 GRE 6.10, Eqn. 2

So we plug in the times (which the problem provides) along with the rates we calculated:

GRE 6.10, Eqn. 3

The difference in output is

GRE 6.10, Eqn. 4

so the correct answer is (B).


Math Review Reference

For more on this topic, see the following section of the GRE Math Review:

  • 2.7: Applications (pp. 25-27, see esp. Example 2.7.4)